Sign In | Join Free | My rc363.com |
|
Brand Name : East
Model Number : Dfjc
MOQ : 1
Price : negotiable
Packaging Details : Wooden case packing
Delivery Time : 5-8weeks
Payment Terms : L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Ability : Peak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Power Supply Voltage : 380V×(100±10%), Three - Phase Five -
Ambient Temperature : –20°c to 50°c (Customization Is Avai
Relative Air Humidity : 20% - 90% (at 20°c), Without Condensation
The equipment features an integrated structure, standardized design, modular production, and a high - level of integration. It allows for overall inspection and testing before leaving the factory, and can be put into operation simply by connecting to power and pipes.
![]() |
East Dfjc Dongfang Integrated Pumping Station Images |